Steel buildings, machines and parts — made in Douala, put up on site
The workshop is on the international airport boulevard, 300 m from Collège St Michel. We build the frame here and put it up where it has to stand: Mbalmayo, Nkoteng, La Dibamba, Buea, Yaoundé.

What we are taking on right now
Steel buildings: 400 to 3,200 m² is the range we have already put up, for factories, stores and agency offices.
Parts and machines: making them, reworking them, replacing them, one at a time or in a run — the hundred cocoa drying ovens for GENERFOP came out of this workshop.
School playground equipment in steel, swings and slides, built in the workshop and assembled in the yard.
Work already delivered
Thirteen sites, and one run of a hundred ovens.
- FAPAM IndustryMbalmayo2 500 m²Built in the workshop, put up on site.
- AFM (Broli)La Dibamba, Douala3 200 m²Erection only: the frame was already made, we lifted and bolted it.
- D T AzimutsNkoteng1 250 m²Built and put up.
- Industrial shedYassa, Douala1 000 m²Built and put up.
- United ExpressOpposite Akwa Palace, Douala400 m²Travel agency: frame and cladding.
- United ExpressOpposite the CNPS hospital, Yaoundé400 m²Travel agency: frame, canopy and roof.
- Private siteMbankomo900 m²Built and put up.
- CNCC, through GENERFOPPort area, Douala1 000 m²Built and put up in the port area.
- GENERFOPPort area, Douala1 500 m²Built and put up in the port area.
- CAMBUILDDouala1 000 m²Built and put up.
- Private siteBekoko, Douala600 m²Built and put up.
- BBPNS SchoolBuea1 000 m²Playground: built and assembled in the yard.
- CHRISMARKA SchoolLogbessou, Douala400 m²Playground: built and assembled in the yard.
- GENERFOPCameroonA hundred cocoa drying ovens, made in one run.
School playgrounds
This is a different trade from roof framing. It comes to us from BIEBER, in Germany, who make nothing else.
The frames are steel, sized by age group: a two-seat swing and a slide station for ages 2 to 5, a three-seat swing from 3 up. We build them in the workshop, set the posts and assemble them in the yard.
Two schools fitted out: BBPNS in Buea, over 1,000 m², and CHRISMARKA in Logbessou, over 400 m².



The team and the workshop
The technical team is twenty-three people: a project engineer, a foreman, two planners, four welder-fabricators, four erectors, four mates, a painter, two carpenters, two civil works technicians, a storekeeper who is also the first-aider, and a driver.
In the workshop we weld at 400 A three-phase and 250 A single-phase, and drill on the pillar, the bench and the magnetic drill. Cold galvanising is done with ZINGA.
On site: 6 m ladders, a cable puller, harnesses for erection, and a generator for the sites that have no power yet.
How to reach us
The phone is simplest. WhatsApp works on both numbers.
For a quotation, tell us the area, the place and the date you want. That is enough to start.
Boulevard de l'aéroport international, à 300 m du collège St Michel. BP 8636, Douala. See it on the map